Public_Works / General Bid Procurement

Project Number: PW-M16003-and-PW-M16004
General Information
Due Date:September 25, 2015
Opening Time:4:00 p.m.
Published Date:August 20, 2015
Last Updated:August 19, 2015
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) FOR THE SEWER TRUNK LINE REHABILITATION PROJECT (PERSHING AVE M16003, AND NAVY DRIVE 24-INCH AND 30 INCH, M16004)
Provide professional engineering services to prepare a preliminary design report for structural evaluation and prepare design documents for the repairs of existing sewer lines
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.
Plans, Attachments & Agendas:
Document:Attachment A - Vicinity Map
Document:Attachment B - Instruction to Proposers

 


 

Project Number: PW1312_CML-5008_127
General Information
Due Date:September 17, 2015
Opening Time:2:00 p.m.
Published Date:August 20, 2015
Last Updated:August 24, 2015
Bid Orientation:Thursday, September 3, 2015, 11:00 a.m., City Hall Council Chambers
Description:MARCH LANE ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS)
Install an adaptive traffic control system at 19 signalized intersections along the March Lane corridor
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerDennis Yep(209) 937-8825Dennis.Yep@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (as of 8-24-15)
Specifications:
Document:Instruction to Bidders
Document:DBE Instruction to Bidders
Document:Specifications
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms
Document:State Wage Rates (8-20-15)
Document:Federal Wage Rates (8-20-15)

 


 

Project Number: PW-M16006
General Information
Due Date:September 17, 2015
Opening Time:4:00 PM
Published Date:August 20, 2015
Last Updated:August 20, 2015
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - 2016 SANITARY SEWER REHABILITATION PROJECT
Provide professional engineering services to prepare the design documents (PSE) to replace approximately 2,898-feet of existing 6-inch sewer lines and 1,410-feet of existing 8-inch sewer lines throughout the City of Stockton
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.
Plans, Attachments & Agendas:
Document:Attachment A - Vicinity Map
Document:Attachment B - Instruction to Proposers

 


 

Project Number: PW-1311-CML-5008-126
General Information
Due Date:September 17, 2015
Opening Time:2:00 PM
Published Date:August 20, 2015
Last Updated:August 25, 2015
Bid Orientation:Thursday, September 3, 2015, 10:30 AM, City Hall, 2nd Floor Council Chambers, 425 N. El Dorado Street, Stockton, CA 95202
Description:PERSHING AVENUE ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS)
Install an adaptive traffic control system at 16 signalized intersections along the Pershing Avenue corridor.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerDennis Yep(209) 937-8825Dennis.Yep@stocktongov.com
Plan Holder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms
Document:State Wage Rates (8-20-15)
Document:Federal Wage Rates (8-20-15)

 


 

Project Number: PW1303_CML-5008_123
General Information
Due Date:September 10, 2015
Opening Time:2:00 p.m.
Published Date:August 13, 2015
Last Updated:August 27, 2015
Bid Orientation:Thursday, August 27, 2015, 10:30 a.m., City Hall Council Chambers 425 N. El Dorado St. Stockton, CA 95202
Description:BUS RAPID TRANSIT PHASE IV (BRT IV) ON CHARTER WAY/DR. MARTIN LUTHER KING JR. BLVD AND MARIPOSA ROAD
The work includes installing: Closed Circuit Television (CCTV) cameras, Transit Signal Priority (TSP) control devices at signalized intersections as shown on the plans, controller cabinets and controllers, electrical services cabinets, and signal wiring conduits.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project Manager Parviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (as of 8-27-15)
Document:Pre-Bid Meeting Sign In Sheet (8-27-15)
Specifications:
Document:Specifications
Document:Instruction to Bidders
Document:DBE Instruction to Bidders
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:State Wage Rates (8-13-2015)
Document:Federal Wage Rates (8-13-2015)

 


 

Project Number: PW1211_HSIPL-5008_125
General Information
Due Date:September 10, 2015
Opening Time:2:00 PM
Published Date:August 13, 2015
Last Updated:August 25, 2015
Bid Orientation:Thursday, August 27, 2015, 11:00 a.m., City Hall, 2nd Floor Council Chambers, 425 N. El Dorado Street, Stockton, CA 95202
Description:EMERGENCY VEHICLE PRE-EMPTION (EVP) INSTALLATION AT VARIOUS LOCATIONS
The work includes installing: Closed Circuit Television (CCTV) cameras, Emergency Vehicle Pre-Emption (EVP) at various signalized locations as shown on the plans, controller cabinets and controllers, electrical service cabinets, and signal wiring conduits.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktongov.com
Plan Holder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List
Document:DBE Pre-Bid Meeting Sign-In Sheet
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans
Document:Special Provisions
Document:State Wage Rages (8-13-15)
Document:Federal Wage Rates (8-13-15)

 


 

Project Number: PW1210_HSIPL-5008_128
General Information
Due Date:September 10, 2015
Opening Time:2:00 PM
Published Date:August 13, 2015
Last Updated:August 25, 2015
Bid Orientation:Thursday, August 27, 2015, 11:30 a.m., City Hall, 2nd Floor Council Chambers, 425 N. El Dorado Street, Stockton, CA 95202
Description:HARDING WAY AND EL DORADO STREET / CENTER STREET
Upgrade traffic signals on Harding Way at El Dorado and Center Streets. The work includes signal pole replacement, Emergency Vehicle Pre-Emption (EVP), new conduit and wiring, and ADA compliant ramps.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktongov.com
Plan Holder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List
Document:DBE Pre-Bid Meeting Sign-In Sheet
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans
Document:State Wage Rates (8-13-15)
Document:Federal Wage Rates (8-13-15)

 


 

Project Number: PW-M16007
General Information
Due Date:September 03, 2015
Opening Time:4:00 p.m.
Published Date:August 20, 2015
Last Updated:August 19, 2015
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) 1025 EAST PARK STREEK STORM DRAIN UPGRADE
Provide professional engineering services to prepare design documents to replace the existing bubbler system with a 12-inch storn drain, new catch basins, maintenance hole, and laterals.
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.
Plans, Attachments & Agendas:
Document:Attachment A - Vicinity Map
Document:Attachment B - Instruction to Proposers

 


 

Project Number: PW-M14006
General Information
Due Date:August 27, 2015
Opening Time:2:00 PM
Published Date:August 03, 2015
Last Updated:August 25, 2015
Bid Orientation:N/A
Description:2014 SANITARY SEWER REHABILITATION
The project will rehabilitate approximately 2,565-feet of sewer pipeline throughout the City of Stockton. Work also includes, temporary sewer bypassing, CCTV, reconnection of service laterals, traffic control, and other work items necessary to do the work.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Planholder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Questions & Answers:
Document:Letter of Clarification No. 1 (8-17-15)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (as of 8-25-15)
Specifications:
Document:Instructions to Bidders
Document:Special Provisions
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans

 


 

Project Number: PW1442_ATPL-5008-139
General Information
Due Date:August 26, 2015
Opening Time:12:00 PM
Published Date:July 30, 2015
Last Updated:August 19, 2015
Bid Orientation:N/A
Description:Request for Proposal (RFP) - SAN JOAQUIN TRAIL - Provide professional consultant services for design
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervanates(209) 937-8492Karla.Cervantes@stocktongov.com
Questions & Answers:UPDATED
Document:Questions - Answers - Clarifications as of 8-19-15
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1437_ATPL-5008-143
General Information
Due Date:August 26, 2015
Opening Time:12:00 PM
Published Date:July 30, 2015
Last Updated:August 19, 2015
Bid Orientation:N/A
Description:Request for Proposal (RFP) - CALAVERAS RIVER BICYCLE AND PEDESTRIAN PATH - Provide professional consultant services for design
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492Karla.Cervantes@stocktongov.com
Questions & Answers:UPDATED
Document:Questions - Answers - Clarifications as of 8-19-15
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1438_ATPL-5008-140
General Information
Due Date:August 20, 2015
Opening Time:12:00 p,m.
Published Date:July 30, 2015
Last Updated:July 30, 2015
Bid Orientation:n/a
Description:Request for Proposal (RFP) FREMONT SQUARE SIDEWALK RECONSTRUCTION PATH PROJECT
Provide professional consultant services for design
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492Karla.Cervantes@stocktogov.com
Questions & Answers:UPDATED
Document:Questions - Answers - Clarifications As of 8-14-15
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW9969_PW1531
General Information
Due Date:August 13, 2015
Opening Time:2:00 p.m.
Published Date:July 20, 2015
Last Updated:July 19, 2015
Bid Orientation:N/A
Description:2015 CURB, GUTTER AND SIDEWALK REPAIR AND CURB-RAMP INSTALLATION - Installation of curb ramps on street corners, and repair of curb gutter and sidewalk damaged by City tree roots throughout various locations citywide.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project EngineerEven Marcelo209-937-8885even.marcelo@stocktongove.com
Plan Holder ListDebbie Froshaug209-937-8328Debra.Froshaug@stocktongov.com
Submittals:
Document:Bid Abstract
Notice:
Document:Notice to Contractors
Specifications:
Document:Specifications
Document:Insrtuctions to Bidder
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Project Map
Document:State Prevailing Wage Rates

 


 

Project Number: PW1313-Federal-Project-HSIPL-5008-124
General Information
Due Date:August 06, 2015
Opening Time:3:00 p.m.
Published Date:July 08, 2015
Last Updated:July 29, 2015
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) INSTALL FLASHING BEACONS, UPGRADE CROSSWALKS AND SIGNS
design the installation of Rectangular Rapid Flashing Beacons, Accessible Curb Ramps, Pedestrian Refuge Islands, and a Pedestrian Path.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMonique Raqueno(209) 937-8613Monique.Raqueno@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-16-001
General Information
Due Date:August 06, 2015
Opening Time:2 p.m.
Published Date:July 14, 2015
Last Updated:July 30, 2015
Bid Orientation:N/A
Description:TREE PRUNING AT VARIOUS LOCATIONS Pruning approximately 2,200 trees in the La Morada, Duck Creek, Morada West and Cannery Park areas. Project also includes one tree removal and the removal of 18 stumps. An alternative bid is requested for the pruning of trees along a portion of the East Bay Municipal Utility District (EBMUD) right-of-way.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan (Christy) Collum-Bradford(209) 937-8372susan.christy@stocktongov.com
Questions & Answers:
Document:Questions & Answers
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Notice to Contractors
Specifications:
Document:Instructions to Bidders
Document:Special Provisions
Document:Bid Forms
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: PW1441
General Information
Due Date:May 11, 2015
Opening Time:12:00 p.m.
Published Date:April 16, 2015
Last Updated:May 06, 2015
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP)
Coordinate and conduct public outreach, surveys and research to develop and finalize Safe Routes to School Curriculum, Plan and Website
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerMonique Raqueno(209) 937-8613Monique.Raqueno@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1436_Federal-Project-ATPLNI-5008-141
General Information
Due Date:May 11, 2015
Opening Time:12:00 PM
Published Date:April 16, 2015
Last Updated:April 24, 2015
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP)
CITY OF STOCKTON BICYCLE MASTER PLAN UPDATE
Coordinate and develop a citywide Bicycle Master Plan
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492karla.cervantes@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Noticetals
There are no Notice documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW-M15004
General Information
Due Date:May 07, 2015
Opening Time:2:00 PM
Published Date:April 02, 2015
Last Updated:April 01, 2015
Bid Orientation:N/A
Description:2014 SANITARY SEWER MAINTENANCE HOLE REHABILITATION PROJECT
The project will rehabilitate approximately 59 maintenance holes throughout the City of Stockton. Work includes materials and equipment required to eliminate infiltration, repair voids, restore structural integrity and provide corrosion protection by applying a spray-applied monolithic liner to all maintenance hole wall surfaces. Work also includes traffic control, confined space entry permit, and other miscellaneous improvements.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@Stocktongov.com
Plan Holder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@Stocktongov.com
Submittals:
Document:Bid Abstract As of 5-7-15
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List as of 4-30-15
Specifications:
Document:Instructions to Bidders
Document:Special Provisions
Plans, Attachments & Agendas:UPDATED
Document:Project Plans
Document:Bid Forms - REVISED as of 4-27-15

 


 

Project Number: PW-15-33
General Information
Due Date:March 26, 2015
Opening Time:2:00 p.m.
Published Date:February 26, 2015
Last Updated:March 16, 2015
Bid Orientation:Mandatory Job Walk Wednesday, March 18, 2015, at 8 a.m. Starts at the McKinley Pool Pump House Vault Access Ramp.
Description:POOL WATER QUALITY AND FILTER SYSTEM MAINTENANCE - Pool mechanical systems operation and water quality control services for Oak, McKinley, Sousa pools and Weber Events Center fountain.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preference Ordinancelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerVictor Machado(209)937-8899victor.machado@stocktongov.com
Planholder's ListSue Christy(209)937-8372susan.christy@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Job Walk Sign-in Sheet
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Vicinity Map
Document:State Wage Rates 2015-02-26
Document:Bid Forms

 


 

Project Number: PW1444
General Information
Due Date:March 12, 2015
Opening Time:3:00 p.m.
Published Date:February 19, 2015
Last Updated:March 09, 2015
Bid Orientation:N/A
Description:Request for Proposals to conduct a traffic sign inventory throughout the City of Stockton
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project EngineerJodi Almassy(209) 937-8302jodi.almassy@stocktongov.com
Questions & Answers:UPDATED
Document:Questions and Answers
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Noticetals
There are no Notice documents to view.
Specifications:
Document:Request for Proposal
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: PW1429-Federal-Project-No.-STPL-5008-132
General Information
Due Date:February 26, 2015
Opening Time:2 p.m.
Published Date:February 04, 2015
Last Updated:March 12, 2015
Bid Orientation:February 17, 2015, 10 a.m., City Council Chambers, City Hall, 2nd floor, 425 N. El Dorado Street, Stockton CA 95202
Description:Street resurfacing project on City streets.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerEven Marcelo(209) 937-8885even.marcelo@stocktongov.com
Planholder's ListDebra Froshaug(209) 937-8328debra.froshaug@stocktongov.com
Submittals:UPDATED
Document:Bid Abstract
Document:Bid Comparison Sheet
Document:Bid - Knife River Construction
Document:Bid Teichert