Significant Industrial Users (SIU) shall comply with the following
requirements:
-
Complete a Wastewater
Discharge Permit application. This application will
be reviewed to assess pretreatment requirements for the
industrial user.
-
Install a monitoring manhole for use by City Environmental
Control Officers.
-
Install wastewater monitoring equipment on-site. This
requirement will be specific to each user, but must users
install a wastewater flowmeter w/ 24 hour circular recording
chart, pH recording device w/ 24 hour circular recording chart,
and refrigerated automatic wastewater sampler capable of
collecting flow proportional samples.
-
Install wastewater pretreatment equipment based on specific
Federal and/or local requirements. Some industrial users will
install equipment to remove solids, oil and grease, heavy
metals, adjust pH, or other general discharge prohibitions.
-
Perform wastewater self-monitoring as require by the Wastewater
Discharge Permit. Typical self-monitoring includes flow
measurement, pH recording, sample collection and analysis for
pollutants such as BOD, TSS and heavy metals.
-
Provide self-monitoring reports to the Environmental Control
section as required by the Wastewater Discharge Permit.
-
Allow unannounced site inspections for pretreatment purposes.
-
Comply with
specific discharge prohibitions, applicable categorical
limits and
local limits.
Wastewater Discharge Fees
Procedures for
Transfer of Excess Capacity
Resolution 02-0671
|
|
|