All work below is scheduled to begin as listed but is subject to change due to traffic incidents, weather, availability of equipment/materials, and construction-related issues.

 

El Dorado St. and Miner Ave. Intersection Paving

The City of Stockton Public Works Department will be closing the intersection of El Dorado St. and Miner Ave. for paving on Saturday, November 6, 2021 (weather permitting). It is anticipated that the intersection will be closed starting at 6:00 a.m. and will be reopened by 5:00 p.m.

  • A detour will be in place.
  • Travelers should watch for workers/signage, reduce speeds & drive with caution.
  • Avoid delays; take alternate routes.

 

Street Resurfacing Project Arch Airport Road

Project Description

The City of Stockton Public Works Department is scheduled to resurface Arch Airport Road from Sperry Road to B Street. The project will include the following:

  • Hot Mix Asphalt Overlay with base failure repairs.
  • Removal and re-installation of striping and pavement marking.
  • This project is funded by Federal-Aid Streets for Fiscal Year 2019-2020.

 

Project Timeline

Project construction is scheduled to begin October 6, 2021, and is anticipated to be completed by December 6, 2021. 

 

Travel Tips

  • Road work will take place between 8:30 a.m. and 4:30 p.m.
  • Night work from October 10-October 15 between 7:00 p.m. and 5:00 a.m.
  • One lane will be open at all times. 
  • Watch for changing message signs and workers directing traffic.
  • All businesses will remain open during construction. 

 

Thornton Road Left-Turn Lane Installation - Under Construction

Project Description

  • New left-turn lane installation on Thornton Road at Hammer Lane
  • New left-turn lane installation on Lower Sacramento Road at Thornton Road/Pacific Ave.
  • Replacing median islands, curb, sidewalk, ramps, and traffic signal equipment.

 

Construction Dates

  • July 12, 2021, through November 1, 2021
  • Periodic 24/7 lane closures will occur for several weeks.
    • Phase 1 - Lane closures on Lower Sacramento Road, between Pacific Ave. & Hammer Lane
    • Phase 2 - Lane closures on Thornton Road, between Rivara Road & El Camino Ave.

 

Roundabout Installation - Under Construction

Tam O’Shanter Drive & Knickerbocker Drive

  • The existing 4-way stop will be converted to a roundabout.
  • A new median island, curb ramps, crosswalks, streetlights, flashing beacons & bike lanes will be installed.
    • Between Erie Drive & Hammer Lane

 

Construction Dates

  • July 19, 2021, through October 30, 2021
    • Periodic lane closures will occur throughout the project.
    • Travelers should watch for workers/signage, reduce speeds & drive with caution.
    • Consider taking alternate routes to avoid delays.

 

Questions & Updates

For questions or updates about projects in progress, please Contact Us through the Municipal Service Center.

 