City of Stockton Fire Department

2007/08 - PLAN CHECK AND INSPECTION FEES

No Plans Accepted Without Fees

(Submit Four Sets of Plans - Five sets for Sprinkler Underground)

AUTOMATIC FIRE SPRINKLER SYSTEMS 

(Includes preaction, deluge and foam water system):

1-10 Heads

$ 127.00     Per hour / 2 hour minimum

11-29 Heads per riser

$1,040.00  Plan Check and Inspection

30-99 heads per riser  

$2,090.00  Plan Check and Inspection

100 - 400 Heads per riser

$2,660.00  Plan Check and Inspection

Over 400 Heads per riser

$2,875.00  Plan Check and Inspection

Standpipes and Hose Stations

$1,824.00   Plan Check and Inspection

 

 

Residential Sprinkler System

No Charge

 

 

Underground Piping for Fire Protection Systems (Sprinkler)

$1,570.00  Plan Check and Inspection

Underground Piping for Fire Protection System (Hydrant) 

 $1,570.00  Plan Check and Inspection

Fire Pump

$2,609.00  Plan Check and Inspection

 

 

Fire Alarm Systems:

 (Automatic or Manual)

$1,824.00  Plan Check and Inspection

(Up to 3 stories plus $523.00 per additional story) Note: When applicable, includes sprinkler waterflow and valve tamper)

Non-required Systems

$127.00 per hour 2 hr. minimum

 

 

Sprinkler Waterflow and Valve Tamper

$887.00     Plan Check and Inspection

Water Flow Testing

$132.00     Per hour/ per person 1 hr. min

AUTOMATIC FIRE EXTINGUISHING SYSTEMS (Non-water Based System)

 

Gas, Halon, C02 Systems

$836.00     Each System

                   Plan Check and Inspection

Non-Flammable Medical Gas Systems

$1,305.00   Each System

                  Plan Check and Inspection

Hood and Duct System

(1-4 Nozzle System)

$127.00       Per hour / 2 hour minimum

                   Plan Check and Inspection

 

 

(5 or more Nozzle System)

$1,305.00  Plan Check and Inspection

 

 

Industrial System (N2 foam)

$887.00     Each System

                  Plan Check and Inspection

ADDITIONAL INSPECTION FEES WHEN REQUIRED:

 

Penalty to Contractor(s) who Install Fire Protection System(s) Without Permit(s)

Double the Above Applicable Rate(s)

Field Test and Inspection
$127.00       One-hour Minimum

Field Test and Inspection

                               After Normal Workday

$191.00     One-hour Minimum

Plan Check/Fire Final

$1,082.00

City of Stockton Fire Department

2007/08 - PLAN CHECK AND INSPECTION FEES

No Plans Accepted Without Fees

                   Plan Check Revision Fee:

 

                             1st Revision:

$0

                             2nd Revision:

10% of original plan check fee

                          3rd and any subsequent Revision:

25% of original plan check fee

Aboveground flamm/comb liq tank or cyl install

$381.00

Aboveground Haz material tank install

$381.00

Aboveground flamm/comb liquid tank removal

$254.00

Haunted House and Amusement Facilities

$381.00

Hazardous Material Operations & Storage Plan

$508.00

Hazardous Material Business Closure Plan

$508.00

Hazardous Material closure plan for facilities with quantities of hazardous materials not exceeding exempt amounts

 

$254.00

Refrigeration Equipment (Ammonia) Review

$635.00

Underground Hazardous Materials Storage Tank

$127.00

Ovens: Industrial Baking & Drying

$381.00

Spray Booth, installation including fire protection system

 

$635.00

Miscellaneous Plan Reviews

$254.00

Underground Fuel System Installation Plan Check

$381.00

Underground Fuel System Inspection (4 or more dispensers and 2 or more underground tanks)

$635.00

Underground Fuel System Inspection (3 or less dispensers and 2 or less underground tanks)

$508.00

Aboveground LPG, LNG or CNG plan check

$254.00

Note:  Plan check and inspection fees cover the review of pertinent plans or documents, the initial inspection and other administrative costs associated with the project.  Additional plan reviewer reinspection resulting from failure to correct plan errors or other special circumstances will be charged at the prevailing hourly inspection fee rate.