City logo and web banner

Sports Facilities

 

Bike and Jogging Paths

  • Calaveras River Bike Path From Buckley Cove to Cherokee Road: 7:43 miles
  • East Bay Municipal Utility District Right-of-Way (south side of March Lane) From Buckley Cove to El Dorado Weston Ranch
  • Pacific Gas and Electric Greenbelt: 1.75 miles
  • San Joaquin River Trail/French Camp Slough Trail: approximately three miles

The San Joaquin Council of Governments, with the support of San Joaquin County and the City of Stockton, extended the Calaveras River path from West Lane to Cherokee Road as a joint project. The extension of the existing 12-foot wide bike path included construction of a bike-pedestrian bridge across the Calaveras River east of West Lane.

 

 

External Links

 


This City of Stockton webpage last reviewed on --- 3/22/2011